OUR PROJECTS

OUR PAST DRILLING & CIVIL WORK PROJECTS IN GREATER GEELONG

EXCELLENT SERVICE FOR EVERY CLIENT

CONTACT US

LORNE MAIN STREET CONDUITS

We installed 1.6 km of conduits in a water table via directional drilling on behalf of Canteri Bros. This allowed overhead power lines to be moved underground. In only three weeks, we were able to complete this project with minimal disturbance to the surrounding area. 


MORTLAKE POWER STATION

We undertook a challenging project of drilling through bluestone to supply a water main to the Mortlake power station and install a recycled water main leaving the station. We developed a special mud program that would allow fallen rocks to float out of the way during drilling.


WARRNAMBOOL HIGHWAY STEEL MAIN

DirectBor Directional Rock Drilling also drilled boreholes to help insert a steel main under Warrnambool Highway. By requirement from Origin Energy, the principal contractor, each borehole was also grouted. This project took our team only six weeks to complete.


GHP & TQY

GHP (Gheringhap) Zone Sub Station and TQY (Torquay) Zone Sub Station feeder exit works and internal cable hauls.


REFCL ASSET RESILIENCE PROJECT

Installation of approximately 10,130 metres of new HV conduit install

Hauled approximately 13,175 metres of cable

Recovered approximately 3,045 meters of redundant cable



Surf Coast -Messmate ISO

TX – 1,240 metres of new built, conduit and cable haul, foundation prep for isolation transformer.


Horseshoe Bend-Blackgate ISO

TX – 2000 metres of new built conduit and cable haul, foundation prep for isolation.


Asset Relocation Works

Asset Relocation Works for multiple LXRP (Level Crossing Removal Program) locations around Geelong & Western Melbourne. All work locations were in high-traffic areas and required coordination and cooperation with multiple companies & asset owners on site. 


Footscray Hospital

Footscray Hospital Feeder Upgrade Works, which consisted of complex boring through multiple third part assets at depths of up to 6 metres.

SEE WHAT OUR CUSTOMERS ARE SAYING

  • ★★★★★

    Have used Directbor on some of my projects and could not speak more highly of them, easy to deal with, attention to detail is great and defiantly made my life easier as a project manager.


    - Justin C.

  • ★★★★★

    Have used Directbor on some of my projects and could not speak more highly of them, easy to deal with, attention to detail is great and defiantly made my life easier as a project manager.


    - Justin C.

WE HAVE BEEN PROVIDING INFRASTRUCTURE SOLUTIONS SINCE 1977

Call us today on 03 5250 1673 and enquire now regarding our services.

Share by: